Enlarging the window opening for a future front door was a massive part of this phase of the work. It also brought me a couple of Brucie bonus benefits.

A new entrance beckons
A new entrance beckons

I can now use the new opening in the wall to get the floorboards out. Plus, I could start to remove all of the floor joists as well.

All this work I could actually do myself. I needed to get the building clear and prepped, ready for the next part of the process to start.

I have the high ground – all floorboards up
I have the high ground – all floorboards up

The plan was to strip the space out entirely. For now, I had to temporarily store the floorboards and (some potentially reusable) joists outside.

To protect from the elements, they got wrapped in tarpaulin and weighted down with some of the many rocks from inside the building.

Floor joists removed, rubble remains
Floor joists removed, rubble remains

Obviously, there were more rusty nails to extract, adding to my ever-growing collection. Strangely, I do have plans for these as well… though I’m beginning to wonder if I might have a few too many plans for my own good sometimes!

Sweet Spot

Vital first steps. Establishing a datum or reference point for the new finished floor level. Unbelievably critical to the project. Builder’s tech to the rescue.

setting accurate finished floor levels
setting accurate finished floor levels

The finished floor-to-ceiling heights of my design are tight. Very tight. If the mezzanine is going to fit with usable heights, these levels have to be spot on.

getting accurate finished floor levels was vital
Getting accurate finished floor levels was vital

Being a little under this, not so much of a problem, possibly a little helpful. It would give me a bit more height above and below to play with.

Going over, however, would be a big NO on all fronts! Completely unthinkable in every way possible. Especially as I’m over 6′ tall! So yes, very vital.

datum point – final finished floor level
datum point – final finished floor level

No pressure on this little screw then. It’s the datum reference point for the final finished floor level of the building. Everything kind of depends on this.

Mean Machines

The real big bonus of the wall opening, however, wasn’t just what I could then remove from the building. More importantly, it was what it also allowed me to bring into the building.

Machine muscle arrives on site
Machine muscle arrives on site

Enter a man who can. I had previously used Dandas’s services to transform access and off-road parking for the building. It was great to be able to call on his services and experience once again.

Enter diggers stage left
Enter diggers stage left

This time, he was bringing some more mechanical marvels to the site.

Diddy digger

But not just on site. The idea was to get one inside the building itself, whilst its big brother helped outside, passing stuff through the gap.

Mini digger in the house
Mini digger in the house

So enough of my manual graft. Way too much like hard work. Time for the mechanical muscle to get to work. There was a lot of debris in the building that now needed to be cleared out.

Rubble and debris gets cleared
Rubble and debris get cleared

Rubble from the new wall opening, the broken-up concrete from the porch floor, plus all the rocks (ollaghs) from the joist supports.

Good job, I’m not house proud, as it’s all got a bit beyond a quick dust and hoover round to tidy things up inside.

scraping back to a firm base level
scraping back to a firm base level

At least now I don’t really need to worry about Hoovering or making a mess on the floor anymore. There is no floor!

A house is a machine for living in
― Le Corbusier

Maybe I should update this to a ‘house is for using a machine in’.

Firm footing

It may be a mini machine, but in Danda’s skilful hands, it was mighty useful within the confines of the building. First task: clear out the debris and rubble.

mini but mighty digger doing its thing
mini but mighty digger doing its thing

Next up, start creating a firm footing. The topsoil needed to be scraped back to a solid base level.

The excess soil got piled up, ready for the mini digger’s big brother to reach in and remove. Mechanical teamwork in action.

digger team work – clear, pile then remove
digger team work – clear, pile, then remove

With Danda’s expertise and understanding of the local ground conditions, he soon established the required base level to be taken out in all directions across the building’s footprint.

creating a firm level base for the new floor
creating a firm-level base for the new floor

This was the new ground zero. From here, work can soon begin on the construction of the new insulated reinforced concrete floor slab.

Yes, you read that right, construction time is finally on the way!

Derelict dream

Regular readers might remember when I first got the building way back when.

I bought it blind. It was located in a place I’d never even been to. An island in the North Atlantic Ocean off the Northwest coast of Scotland.

I’m old enough to have known better, really. Anyway, it’s now ‘progressed’ from this…

Original interior picture from the Estate Agents of the Small Mission Hall
Original interior picture from the Estate Agents of the Small Mission Hall

to this… the eagle-eyed amongst you might spot the odd difference or two?

Reached rock bottom
Reached rock bottom

Things are pretty much as low as they can get now. I’ve no floor, more of a mud-based paddling pool, that and a gaping hole in the wall.

On the plus side, I suppose you can now get to park a mini digger inside the building. Yeah, I really am living the dream!

Rock bottom

I suppose progress is really a matter of perspective.

From here, things can finally leave the demolition phase. Time to enter a whole new realm of construction – actually building rather than tearing down.

If you’re interested in following the progress and adventures, feel free to subscribe to receive updates, or simply follow (Instagram or Facebook) to join the journey. No catches, no spam!

Rest assured, there’s absolutely no AI-generated churn here; it’s just my own quirky outworking of ideas and dreams, as I look to renovate a derelict Small Mission Hall in the Outer Hebrides.

So what do you think?

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Other posts you might like…

feel free to share…