Installing the structural steel A-frame was a pivotal moment for the project. This structural element determines the dimensions for the mezzanine floor, a key part of my design idea for the Small Mission Hall. To say a lot was relying on it would be a massive understatement!

Spot the new structural addition to the building
Spot the new structural addition to the building.

Now that this structural datum is established, the next batch of steelwork can get fabricated off-site in Stornoway. Whilst this is in production, it’s time for the next phase of work to begin.

Last legs

The building’s original windows were well past their sell-by date; they were really on their last legs. The wooden frames are rotten and badly deteriorated, barely keeping the single panes of glass in place.

Old original single glazed windows ready to be replaced
Old original single-glazed windows ready to be replaced

I had already made a few additions just to keep them in place and stop them falling out, to try and coax them to survive an extra few months to this point.

temporary fix to keep windows in place
Temporary fix to keep the windows in place

At least I know they will all come out fairly easily when the new ones are fitted. It will also be time to remove the current front door, as this will be changed into a new large window for the future bathroom space.

Coding for original window replacement
Coding for original window replacement

I had been planning the window upgrade replacements for literally a year or more! I was advised to hold off ordering them until planning permission and building warrants had been approved. That time was finally now.

Window wonderland

More big changes incoming. Whilst the new steelwork was in production, there was time for more exciting deliveries to arrive on site.

New double glazed replacement windows arrive
New double-glazed replacement windows arrive.

Finally, it was delivery day for the new replacement double-glazed windows. OK, maybe not that exciting in the big scheme of things, but for me in my situation, these are a big deal!

New feature double glazed window for the bathroom
New feature double-glazed window for the bathroom

Different details

Unlike the original windows, I’ve opted for no top-opening transom on the main windows. I wanted a simpler, less fussy aesthetic for the building’s interior and exterior elevations.

I wanted a more contemporary black-and-chrome look for the windows with simple tilt-and-turn opening. Visually, this makes the window frames disappear rather than distract.

Black and chrome window locking handle detail
Black and chrome window locking handle detail

Losing the transom (horizontal divider) and its additional framing also has practical benefits. It allows a surprisingly large amount of extra light (and thus heat) into the building. What’s not to like about that?

However, with the bathroom window, for additional manual ventilation purposes, I decided to include a top-opening transom window. I’m nothing if not pragmatic with my design decisions.

New timber for window fixing installs
New timber for window fixing installs

Having a clear, dry interior space in the building will prove to be very useful moving forward with the renovation work. It will become a combined store and workspace over the next few months.

reflective beauty of new double glazed windows
Reflective beauty of new double-glazed windows

Means my bedroom might be outside in the camper for a while to come as the work gets underway.

Removal ready

As expected, removing the original windows was met with little resistance. Once the openings were cleaned up a little, the new windows could be fixed in place.

Existing windows were easy to remove ready for replacement
Existing windows were easy to remove, ready for replacement

The original frames were being held together by little more than prayer and aluminium tape. Some took very little effort to remove; it was more of a surprise that they had held together for so long in the first place!

original window frames were beyond repair
Original window frames were beyond repair.

Helping hands

I know my limitations. I had been discussing the project and my ideas with a recommended local tradesman for ages before we actually got to this point.

It was good to finally bring him on board to crack on with the actual installation. I was happy to just labour and be an extra pair of hands where needed.

Replacement bathroom double glazed window fitted
Replacement bathroom double-glazed window fitted

Once out, the new windows went in fairly smoothly and provided an instant transformation to the look and feel of the space and building as a whole!

The original front door could now be removed, so that the new large replacement window could be fitted. Fitting it will totally transform the space.

Original entrance door to become new bathroom window
Original entrance door to become new bathroom window

Previously, the entrance lobby space was quite dark; this now lets in so much more light. I had designed it so that the future shower would be in the opposite corner to the new window.

Here you will not only get washed in water, but also by the morning sunlight* that can now flood the space through the new feature window.

*  Terms and conditions apply.
The Outer Hebrides is not always, hardly ever, very rarely that sunny!

Feature bathroom window replaces old otiginal front door
Feature bathroom window replaces old original front door

Each time I now look into the space, it looks like I’d either left the door open or the light on. The new window has made such a huge difference!

Love light

With the new glazing installed, the building will be internally bathed in natural light! Plus, of course, it’s another form of insulation to help with the building’s overall thermal performance. Progressively, things are slowly improving.

the buildings future is looking a bit brighter
The building’s future is looking a bit brighter.

If you’re interested in following the progress and adventures, feel free to subscribe to receive updates, or follow (Instagram, Facebook, YouTube, and TikTok) to join the journey – no catches, no spam!

Rest assured, there’s absolutely no AI-generated churn here; it’s all just my own quirky outworking of ideas and dreams, as I look to renovate an old, derelict Small Mission Hall in the Outer Hebrides.

Amazingly, without the help of AI, I’ve actually managed to write my own text, create my own images and produce my own unique content. Hope you like it.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Other posts you might like…

feel free to share…